Dougarie Hydro Scheme is a 500kW scheme that was built on the river Allt Gobhlach, near Pirnmill, Arran. Designed by Campbell of Doune, we were contracted to complete all Civil Engineering aspects of the scheme, which included:
The scheme has been running extremely successfully for the client and it thought to continue to do so for many years. The water is passed through a Canyon Turbine, which generates the power for being sent back onto the National Grid.
Ardchattan was particularly challenging due to the site being off the mainland and having limited resources on the island. Most activities had to be planned in advance so that materials could be gathered at our Main Office, to be delivered on a single artic load to site.
Just back from annual leave and visited Aberdalgie this morning.
Can I say the guys have done a fantastic job!!!, it looks better than I imagined and want you to pass this onto them. Well done guys.
Liam Hynd, Assistant Bereavement Services Officer
Just wanted to email you a ‘fantastic job’ note.
Your guys, headed up by Brian, are so courteous and helpful and run a very tidy site, safe and efficient.
The quality of the job is excellent.
Nick Riley, Landscape Architect
"MAM are a genuine great ground work and civil engineering contractor. Great reputation locally and afar."
Jim O'Brien
"Excellent service"
Andrew Mckenna
"Done a great job in our garden with no trouble."
Tam Watson
Your staff were very respectful of the historical site, polite to all staff and members of the public. Left the site in a clean and tidy manner each day.
Paul Winn, Clerk of Works (PKC)
Thank you again for the great works completed, it was a pleasure working with MAM on this. I will ensure to get some KPI's over to yourself now its completed with the positive feedback.
Darrel Wilson - Project Engineer (FLS)
Just to say the guys have done a tidy job, all as agreed, which is appreciated.
Richard Thomas - Managing Director (Hygenius)
The tradesman has done a fantastic job, and the wall looks amazing and most importantly safe!
School Headteacher
Aberchalder and Glengarry estate would like to thank Mike and all of the team at MAM on the successful completion of the two substantial projects on our property overcoming (extreme at times) adverse weather conditions at altitude with challenging access and accessibility, care and respect to the sensitive environment and to the quality of design and reinstatement procedures followed.
We wish all the very best to MAM with all their future projects and we would be delighted to recommend their services to any prospective clients.
Steve Mackenzie (Factor)